Evidence before equipment
Earthmoving Adelaide Site Checklist

Tick an item only when a drawing, photograph, measurement or named responsibility supports it. Unchecked items become questions for the relevant reviewer.
Twelve checks for an Adelaide earthmoving brief
Method: convert gaps into assigned actions
Group unchecked items into evidence the owner can supply, site facts the provider must inspect, and matters for a surveyor, engineer, locator, licensed trade or approval authority. Do not close a gap with a guess. Add a responsible party and the point in the sequence when their answer is needed.
For constrained Adelaide properties, walk the path from kerb to bucket position. Photograph every direction change and show how spoil reaches the truck. For sloping ground, attach supplied levels and explain existing runoff. For exported material, state what is known and ask for cartage, classification and receiving assumptions in writing.
What the checklist cannot establish
This page cannot confirm soil, rock, groundwater, contamination, private services, structural design, approval or a safe excavation method at an address. It prepares a disciplined conversation. Review current SafeWork SA excavation guidance and obtain project-specific advice where the work requires it.